critical air logo
AU 08586
service call request
Call Now: 02 9054 1210 facebook

Chiller Replacement

 

AstraZeneca Alma Road Chiller Replacement.

As part of AstraZeneca's commitment to innovation , sustainability and Enviromental stewardship , they are constantly monitoring their equipments performance and economical serviceable lifecycle. With this in mind they approached Critical Air to check the performance of their then current Multistack Chillers and to report on what other alternatives there were that would meet their criteria and provide them with energy savings long term.

After checking and consulting with various manufacturers Critical Air presented Astra with a proposal that recommended the installation of PowerPax chillers. These were chosen because of their innovative technology,design and energy savings for commercial Air Conditioning services solution.

Since the installation of the chiller in 2008 the saving in energy has been approximately 11% year on year.

Being quite different in design to the chiller they were replacing installation provided some challenges which included having to strip the chiller being replaced and to remove it in sections and to install the new chiller in sections.

  • Stage 1

    Stage 1

    Modular Multistack Chiller to be stripped and removed.
  • Stage 2

    Stage 2

    Multistack Chiller removed from plantroom and dismantled ready to be transported away from site.
  • Stage 3

    Stage 3

    PowerPax Chiller being installed using a Crane and lowering it through a purpose built Access Tunnel.
  • Stage 4

    Stage 4

    Chiller assembled and installation of PowerPax complete.

Copyright © Critical Air 2018       Health and Safety Policy    Website designed by New Frontier

Commercial Air Conditioning Services Sydney | Industrial Air Conditioning Services & Maintenance Sydney